imprimer la fiche

Germany


PROJET

  • client
    • DFS & Eurocontrol Maastricht
  • année de référence
    • 2006
  • date de démarrage
    • 01/01/2006
  • durée du projet
    • 3 years

DL-FEP

> Description du projet

 

In order to provide the cost-effective, seamless world-wide air traffic management system required for to answer the traffic forecast, the International Civil Aviation Organisation (ICAO) has defined the concept known as CNS/ATM (Communication Navigation Surveillance / Air Traffic Management). It is based on a set of technologies aiming at providing a new supporting infrastructure for ATM, essentially based on the combination of a set of ground-based technologies and satellites.

 

Along with satellite-based navigation (GNSS), the Aeronautical Telecommunication Network (ATN) is the main cornerstone of CNS/ATM. It has been designed to allow seamless data communications all over the world between air traffic management organisations, airlines and the aircraft, in order for these three parties to better co-ordinate their actions.

 

 

 

The EGIS AVIA Datalink Gateway comes from the needs expressed by EUROCONTROL and the German Air Navigation Service provider to acquire the next generation of data link gateway systems. This Datalink Gateway is proposed as a key component of a Datalink infrastructure providing integrated ATN End System functions and FANS End System functions to accommodate already FANS1/A+ equipped aircraft. It permits air traffic controllers to exchange data link messages with pilots on data link equipped aircraft.

 

 

The EGIS AVIA Datalink Gateway will be integrated with the Air Traffic Management Systems installed at the EUROCONTROL Maastricht Upper Airspace Control Centre (MUACC) and the DFS En-Route centre at Karlsruhe.

 

 

> Description des services fournis

 

  • Specification and development of the EGIS AVIA Datalink Gateway supporting the following functions:
    • An ATN End System communication stack,
    • A customizable interface to connect external Flight Data Plan Systems (FDPS),
    • An optional FANS 1/A+ communication stack,
    • An optional Accommodation function providing an homogeneous interface (ATN link) to the FDPS allowing the management of FANS and ATN aircraft by controllers in a consistent way,
    • An SNMP agent allowing the management of the EGIS AVIA DL-GTW by a remote SNMP manager,
    • A local management and display function allowing the management and supervision of the EGIS AVIA DL-GTW,
    • An optional Legal Recording function allowing the sending of all Datalink messages transiting through the EGIS AVIA DL-GTW to an external recording system,
    • A Resilience function providing a high availability redundant DL-GTW cluster.
  • Validation of the EGIS AVIA Datalink Gateway. Validation of the product is made according to the applicable standards of the EUROCONTROL LINK2000+ program baseline. It shall meet the interoperability and safety requirements on ground systems using data link services (ED-110A/B and ED-120). The components have been developed as safety critical applications demanding software design and quality assurance consistent with “essential” certification requirements.
  • Installation and Maintenance of the EGIS AVIA Datalink Gateway (10 years).
  • Training of the Eurocontrol and DFS operational teams.